Fleher Bridge

Location

Düsseldorf, Germany

System type

single-pylon central girder cable-stayed bridge (highest pylon in Germany, 146m)

Services by ROTEC

  • Vibration measurement on all 96 suspension cables
  • Determination of the load-bearing capacity
  • Magnetic inductive testing of all 96 ropes
  • Camera inspection (automated visual inspection) of all 96 ropes

Year of construction

1976-1979

Manufacturer


planner

Gerd Lohmer, Cologne