rope inspection XXL

rope inspection XXL

In July 2019, ROTEC GmbH was contracted with the magneto-inductive testing of all 80 stay cables up to 121mm in diameter on the Dusiburg Baerl bridge over the Rhine (Federal Motorway 42).

Thanks to the modern rope testing machines of ROTEC GmbH, the project could be carried out quickly and efficiently.

We thank the client, Straßen.NRW, for the good and target-oriented cooperation.