New Eckbauer Cablecar

New 6-MGD Eckbauerbahn

Opening of the new “Eckbauer” cablecar in Garmisch-Partenkirchen

Parallel to Interalpin 2019, at which ROTEC GmbH was represented with its own exhibition stand, the ROTEC team was allowed to carry out the acceptance test of the new Eckbauerbahn in Garmisch-Partenkirchen. The new detachable 6-seater gondola lift of the Austrian ropeway manufacturer Doppelmayr ↗ replaces the 2-seater gondola lift of Pohlig-Heckel-Bleichert (PHB) which went into operation in 1956.

Translated with www.DeepL.com/Translator

Performance of ROTEC GmbH over the complete project period:

  • plan verification
  • structural analysis
  • Complete acceptance of all electrical, electronic and mechanical components
  • Acceptance of the fire protection
  • Magneto-inductive rope inspection of the haul rope
  • Visual rope inspection with the Winspect camera system

We wish the Partenkirchener Bergbahnen GmbH & Co. KG ↗ always a good and safe trip!

Cookie-Einstellung

Bitte treffen Sie eine Auswahl. Weitere Informationen zu den Auswirkungen Ihrer Auswahl finden Sie unter Hilfe.

Treffen Sie eine Auswahl um fortzufahren

Ihre Auswahl wurde gespeichert!

Hilfe

Hilfe

Um fortfahren zu können, müssen Sie eine Cookie-Auswahl treffen. Nachfolgend erhalten Sie eine Erläuterung der verschiedenen Optionen und ihrer Bedeutung.

  • Alle Cookies zulassen:
    Jedes Cookie wie z.B. Tracking- und Analytische-Cookies.
  • Nur First-Party-Cookies zulassen:
    Nur Cookies von dieser Webseite.
  • Keine Cookies zulassen:
    Es werden keine Cookies gesetzt, es sei denn, es handelt sich um technisch notwendige Cookies.

Sie können Ihre Cookie-Einstellung jederzeit hier ändern: AGB. AGB

Zurück